CCT Stage2 Hi-Flow Billet Turbo charger for Nissan GU Patrol ZD30 3.0L (724639 / 14411-VS40A)
CCT Stage2 Hi-Flow Billet Turbo charger for Nissan GU Patrol ZD30 3.0L (724639 / 14411-VS40A) is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Local Pickup Available
Local Pickup Available
Address:
Factory 1, 107 Wells Road, Chelsea Heights VIC 3196
Business hours:
8:30am-5:00pm Mon-Fri
(Excluding Public holidays)
Delivery and Shipping
Delivery and Shipping
- Shipping costs are calculated in the checkout.
- Free standard shipping for all orders over $350 via Australia Post
(Only available to Australian residents) - Express shipping is available and calculated in the checkout
- International shipping also available
Australian Hassle Free Warranty
Australian Hassle Free Warranty
All CCT Stage1 & Stage2 turbochargers come with a 24 Month Warranty and are backed by our Lifetime Rebuild Guarantee.
CCT Quality Standards
Product Overview
CCT Stage 2 Turbocharger Upgrade for Nissan Patrol GU ZD30 (1999–2017)
The CCT Stage 2 Turbocharger Upgrade is engineered for the Nissan Patrol GU (Y61), built between 1999 and 2017, and powered by the ZD30 3.0L DI engine.
Developed for higher-flow performance builds, the CCT Stage 2 is intended for applications using supporting ECU calibration and suitable engine modifications where increased airflow and greater peak power potential are required.
Engineering upgrades include +4mm Billet + Slim Hub + High Blades + Extended Tips, combined with Factory Turbine Wheel and Enhanced 360° Thrust Bearing . Together, these changes are designed to improve compressor efficiency, mid-range response and durability under increased load, with a listed boost capability of up to 24 PSI.
Complete technical specifications, vehicle compatibility and performance comparison are provided below.
Turbocharger Specifications
14411VS40A / 11441V040A / 11441-V040A + 8 more
769328-000 / 769328-5001 / 705954-0008 + 39 more
Vehicle Fitment Guide
Check the vehicle, chassis, year and engine details below before ordering.
| Vehicle | Chassis / Series | Year Range | Engine | Fitment Notes |
|---|---|---|---|---|
| NissanPatrol Nissan Patrol GU Y61 ZD30 DI (1999-2003) | GU Y61 | 1999–2003 | ZD30 3.0L DI | |
| NissanPatrol Nissan Patrol GU Y61 ZD30 DI (2004-2006) | GU Y61 | 2004–2006 | ZD30 3.0L DI | Confirm part numbers before ordering. |
| NissanPatrol Nissan Patrol GU Y61 ZD30 CRD (2007-2017) | GU Y61 | 2007–2017 | ZD30 3.0L CRD | Confirm part numbers before ordering. |
CCT Performance Upgrade Comparison
Compare the available CCT turbo upgrade stages for this turbo family. Select a stage heading to view the matching product.
| Technical Specification | Standard Turbo OEM Replacement | Stage 1 Daily Performance | Stage 2 High-Flow PerformanceCurrent |
|---|---|---|---|
| Compressor Wheel | Factory Cast Compressor Wheel | Billet + Slim Hub + High Blades + Extended Tips | +4mm Billet + Slim Hub + High Blades + Extended Tips |
| Turbine Wheel | Factory Turbine Wheel | Factory Turbine Wheel | Factory Turbine Wheel |
| Thrust Bearing | 360° Thrust Bearing | 360° Thrust Bearing | Enhanced 360° Thrust Bearing |
| Recommended Maximum Boost | Up to 14 PSI | Up to 21 PSI | Up to 24 PSI |
Boost figures are general capability references. Final boost targets should be set to suit the engine condition, fuel system, supporting modifications and ECU calibration.
Frequently Asked Questions
Will this turbo fit my vehicle?
This turbo is listed for Nissan Patrol GU applications shown in the Vehicle Fitment Guide below. Confirm the chassis code, engine code, production year and existing turbo part number before ordering.
What OEM turbo numbers does this replace?
The primary OEM reference is14411-VS40A .Compatible alternative references include14411VS40A / 11441V040A / 11441-V040A / 14411VC100 / 14411-VC100 / 14411VC200 / 14411-VC200 / 144112X90A / 14411-2X90A / 144112X900 / 14411-2X900 .
Is this a direct bolt-on replacement?
Yes. This turbo is supplied as a direct bolt-on replacement for the listed applications, using the factory mounting locations and connections. Correct installation procedures and root-cause checks should still be completed before fitting.
What is included with the turbo?
The package includes the complete turbocharger assembly, the matching actuator and an installation gasket kit.
What engineering specification does this Stage 2 use?
Compressor wheel: +4mm Billet + Slim Hub + High Blades + Extended Tips.Turbine wheel: Factory Turbine Wheel.Thrust bearing: Enhanced 360° Thrust Bearing.
What boost level is this turbo designed to support?
The listed reference capability for this Stage 2 is up to 24 PSI. Final boost targets must suit the engine condition, fuel system, supporting modifications and ECU calibration.
Does this turbo include an actuator?
Yes.The supplied unit includes aVacuum Actuator .
Is ECU tuning required?
ECU tuning and suitable supporting modifications are recommended to achieve the intended higher-flow performance safely.
Which CCT turbo stage should I choose?
Stage 2 is intended for higher-flow performance builds with supporting modifications and suitable ECU calibration.
Use the CCT Performance Upgrade Comparison on this page to compare the available stages for this turbo family.
What warranty and technical support are included?
CCT turbochargers are backed by a 24-month Australian warranty, local technical support and post-warranty rebuild assistance subject to inspection, parts availability and warranty terms.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.



